The first of the windows to go in were in the basement.
The kitchen windows. The sink will be under the triple window on the left. The range will be between the triple windows and the single narrow window on the right. The plumbing work has started, too. Henry's favorite word these days: pipe.
The side addition: kitchen and bathroom downstairs, master bedroom upstairs.