The kitchen windows. The sink will be under the triple window on the left. The range will be between the triple windows and the single narrow window on the right. The plumbing work has started, too. Henry's favorite word these days: pipe.
The side addition: kitchen and bathroom downstairs, master bedroom upstairs.
The big rear windows downstairs are in and the master bath windows are about to be hung.